Fiber optic cable pulled from a drum into an underground duct

Services · Fiber cabling

Fiber, from the duct to the splice.

Pulling, installation, splicing, termination and testing of fiber optic cable, for outside and inside plant.

Have a site in mind?Talk to an engineer

What we cover

Every metre of the run.

Disciplines
Pulling · Installation · Termination
Stages
Pulling → Installation → Termination → Testing
Based in
Al Malaz, Riyadh 12836

Pulling

Scope
Fiber optic cable laid, pulled and routed through ducts, conduits and pathways, outside and inside buildings.
Includes
Outside plant (OSP)
Inside plant (ISP)
Ducts and conduits

Installation

Scope
Cable dressed and secured on trays and along its route, with fiber distribution systems and accessories installed.
Includes
Cable trays
Fiber distribution systems
Labelling and records

Termination

Scope
Fibres jointed, spliced and terminated at each end, then tested before handover.
Includes
Splicing and jointing
OTDR and power meter tests
Fault finding

How we deliver

Pulled, installed, terminated, tested.

Every fiber job follows the project's specifications, safety procedures and quality standards, with CTC's teams working alongside the site engineers and supervisors, and the network maintained after handover.

Pulling
Cable pulled through the ducts and pathways.
Installation
Cable laid and secured along its route.
Termination
Fibres spliced and terminated at each end.
Testing
Every fibre tested with an OTDR or power meter, and any fault traced and fixed.

Where we work

Where CTC's fiber teams have worked.

Fiber optic cabling and telecom works on major project sites in the Kingdom.

Orange and black ducts laid in an open trench in the desert
  • Almarai project sites
  • STC project sites

Other services

Start a project

Have a site in mind?

Plan it with the project planner, or send the details straight to an engineer.

+966 11 477 6232info@ctcsaudi.com