Phase 1 of 4

Survey and design

Surveys, design and planning before work starts on site.

Empty equipment room with bare cable trays

What happens

  • The site and the client's requirements, understood first.
  • A logical design built to scale and to stay modular.
  • The detail, built for performance, availability and reliability.
  • The client's feedback, with security and cost checked before installation.
  • Costing settled before construction starts.

Phase 2 of 4

Pathways and cabling

Pathways, cabling and civil works delivered to the design.

Cable dressed in the overhead trays

What happens

  • Civil works built by CTC's own construction team.
  • Power and building services supplied and installed.
  • Copper and fibre cabling installed under the supervision of certified data cabling installers.
  • Cabling inspected before installation.

Phase 3 of 4

Systems installed

Systems installed, connected and integrated across disciplines.

Racks installed along the aisle

What happens

  • Cabling, devices and control panels installed to the design.
  • Configuration and integration for telecom networks.
  • Systems connected and tested together before handover.

Phase 4 of 4

Live and maintained

Tested, handed over and maintained after go-live.

The room live, with equipment lights on

What happens

  • Testing and commissioning, with cabling tested at handover.
  • Inspection, testing and maintenance after go-live.
  • Operation and maintenance for data centers.

One contractor

Civil, power and systems on one job.

Contracting sits beside CTC's ICT and low current teams, so a site's works can go to one contractor:

  • Civil and building works
  • Power and building services
  • ICT and low current systems